
Description
This new construction home is scheduled to be complete in early December of 2022. Conveniently located near Southport, Oak Island, and Wilmington; Boiling Spring Lakes is a quickly growing community without any HOA obligations! Once complete, this single level home will include three bedrooms, two full bathrooms, and just over 1,100 square feet. The lot is 0.24 acres in size and a concrete driveway will lead you into your single car garage. A covered front porch and screen in back porch will also be included once finished. Other features will include durable granite in the kitchen and both bathrooms and LVP flooring throughout the home. In the kitchen you will find a built-in microwave, stainless-steel range, dishwasher and garbage disposal. Ceilings will be 9' tall and ceiling fans will be installed in each bedroom and the living room. The spacious master suite will feature a walk-in closet and tiled walk-in shower. 98 S High Point Rd. is currently under construction with an estimated completion date of early December 2022.
-
3BEDS
-
0.25ACRES
-
2BATHS
-
01/2 BATHS
-
1,146SQFT
-
$0$/SQFT
School Information
Description
This new construction home is scheduled to be complete in early December of 2022. Conveniently located near Southport, Oak Island, and Wilmington; Boiling Spring Lakes is a quickly growing community without any HOA obligations! Once complete, this single level home will include three bedrooms, two full bathrooms, and just over 1,100 square feet. The lot is 0.24 acres in size and a concrete driveway will lead you into your single car garage. A covered front porch and screen in back porch will also be included once finished. Other features will include durable granite in the kitchen and both bathrooms and LVP flooring throughout the home. In the kitchen you will find a built-in microwave, stainless-steel range, dishwasher and garbage disposal. Ceilings will be 9' tall and ceiling fans will be installed in each bedroom and the living room. The spacious master suite will feature a walk-in closet and tiled walk-in shower. 98 S High Point Rd. is currently under construction with an estimated completion date of early December 2022.
